Cubes left outside in cold temperature

Guys, we did a concrete pour today (fibre) and I left the cubes outside, it is looking to be around 3-4 degrees Celsius overnight. I'm planning to get them inside the office first thing in the morning - am I looking at any significant loss of 28 days strength?

Normally our concrete cures at around 30% over specified strength